Control joints are planned cracks which allow for movements caused by temperature changes and drying shrinkage. In other words, if the concrete does crack, you want to have an active role in deciding where it will crack and that it will crack in a straight line instead of randomly.
Copyright © 2023 High Tower Concrete Cutting Pty Ltd
site by mulcahymarketing.com.au